Description
: a secondary or repair cement method using upper and lower perforations and a packer. Circulation is established with water and mud remover chemicals to clean the channel. set between Cement is circulated with a set volume pumped, then the packer is released and pulled above the zone. The cement is displaced from the tubing. A secondary squeeze may be done.
Source :
Vterm research team